Representative projects
A selection of recent work. Client and site names are withheld; references are available on request. Photographs are from our own crews on the jobs described.
Data centersIndustrial and manufacturingHealthcareMultifamily and high-riseOffice and retailSchools and institutions
New roof assemblies on data halls under construction
Insulation, cover board and membrane on new metal deck, with material staged by crane and the work sequenced building by building around the structural trades. Every roof had perimeter guardrail, badged access and a daily report to the general contractor.
Single-ply roofing across a secure, multi-building campus
Membrane roofing over insulation on new data halls, installed by crews organized by sector with a bilingual lead in each. The job ran under badge-controlled access and operator-set work windows, with materials loading and crane safety plans for each building and a daily report to the general contractor and the operator.
PVC membrane roof on a new data hall
Full roof assembly in a thermoplastic PVC system, with material staged by crane around live site operations. A traveling crew mobilized from Maryland and stayed through completion.
Recover of a ballasted EPDM roof on an occupied building
We removed and handled the existing stone ballast, prepared the existing membrane and installed a new single-ply system over it with the building in use throughout. Preconstruction planning covered staging, hoisting and tenant access.
Full tear-off and TPO replacement with structural deck replacement
We removed an aged built-up roof to the metal deck across a large manufacturing plant, cut out and replaced the deteriorated deck sections, then installed new insulation, cover board and a mechanically fastened TPO membrane. Crews worked in harnesses at every deck opening, and the plant kept running underneath.
TPO re-roof around skylights, curbs and a new parapet
We replaced the low-slope roof on an operating manufacturing facility with new tapered insulation, flashed dozens of skylights and mechanical curbs, and rebuilt and capped the perimeter.
Summer re-roof of an occupied school
We tore off the roof of a K-12 building and installed cover board and a new single-ply membrane inside the summer break, with the rooftop units flashed in place and the building ready for the first day of classes.
TPO roof replacement on an occupied high-rise
We replaced the membrane on a residential tower with perimeter safety netting and crane hoisting from the street under a traffic plan, with residents in the building throughout.
Winter installation of a single-ply roof
A traveling crew installed a full single-ply roof from January through March, with winter-grade adhesives stored heated and seams welded and probed daily. The roof was finished before the spring schedule needed it.
TPO re-roof under live rooftop piping and equipment
We replaced the membrane beneath pipe racks and condenser units on an operating facility, re-flashed each support and sequenced the work so that no equipment was taken out of service.
Steep-slope architectural shingle re-roof
We tore off and replaced an architectural shingle roof with a full manufacturer system: ice and water protection, ventilation and new flashings.
Penetration flashing program on a KEE membrane roof
We flashed seventy-two pipe penetrations with manufacturer-supplied boots on an operating facility in two working days, without interrupting the tenant.
Want to see a job like yours?
Tell us the building type and the system, and we will put you in touch with an owner or general contractor we have worked for.
Ask for references