Data centers and mission-critical facilities

A large share of our recent production has been on data center campuses in Virginia, Ohio and Indiana. We know the rules of a secure site and we staff to close a roof section before the weather does.

What matters on this kind of building

  • Badged access, escorts and background checks for every worker on the campus
  • Work windows set by the operator, including nights and weekends
  • No dust, debris or fumes near air intakes; crane picks coordinated with security
  • Live roofs with pipe racks, condensers and exhaust that cannot go out of service
  • A daily report the general contractor and the operator can both act on
New metal roof deck on a data hall with perimeter guardrail

How we run it

We organize data center crews by sector, with a bilingual lead in every sector, a drawn staging and sequencing plan for each building and a materials loading and crane safety plan before the first lift. We have run large crews on a single secure campus, and we report to the general contractor and the operator every day.

Representative projects

Data centers work we have done

Central VirginiaData center campus
2026, in progress

New roof assemblies on data halls under construction

Insulation, cover board and membrane on new metal deck, with material staged by crane and the work sequenced building by building around the structural trades. Every roof had perimeter guardrail, badged access and a daily report to the general contractor.

New metal roof deck on a data hall with perimeter guardrail and curbs in place
Northern VirginiaData center campus
2026, in progress

Single-ply roofing across a secure, multi-building campus

Membrane roofing over insulation on new data halls, installed by crews organized by sector with a bilingual lead in each. The job ran under badge-controlled access and operator-set work windows, with materials loading and crane safety plans for each building and a daily report to the general contractor and the operator.

Central OhioMission-critical facility
2026

PVC membrane roof on a new data hall

Full roof assembly in a thermoplastic PVC system, with material staged by crane around live site operations. A traveling crew mobilized from Maryland and stayed through completion.

White PVC membrane field on a new data hall with the parapet flashing complete
Central IndianaMission-critical facility
2026

TPO re-roof under live rooftop piping and equipment

We replaced the membrane beneath pipe racks and condenser units on an operating facility, re-flashed each support and sequenced the work so that no equipment was taken out of service.

White TPO roof with pipe supports and rooftop equipment reinstalled

Have a data centers roof to price?

Send the drawings, a roof report or just the address. We will tell you what we see and what it will take.