How we work
The same six steps on every job, whatever the size. Each one ends with something in your hands: a measured scope, a price with unit rates, an approved submittal, a safety and loading plan, a daily report, a warranty. Nothing is ordered before it is approved and nothing is covered before it is photographed.
-
01
Survey and takeoff
We walk the roof, core it where the history is unclear and read the full drawing set, including the plumbing, mechanical and civil sheets. Quantities are measured, not guessed: field area, parapet heights, every drain, curb, penetration and foot of edge metal.
You receive: A written scope with measured quantities and a recommendation on recover versus replacement.
-
02
Proposal with unit prices
The proposal states what is included, what is excluded and the unit price for anything that could change: wet insulation, deck replacement, added curbs. A change becomes a conversation about quantity, not an argument about scope.
You receive: A fixed price, a schedule of unit prices and the exclusions in plain language.
-
03
Submittals and shop drawings
Before anything is ordered we submit the product data, the roof assembly letter stating securement by corner, perimeter and field zone, the tapered plan and the sheet metal shop drawings with gauges and profiles.
You receive: A reviewed submittal package the architect, the manufacturer and the owner have signed off.
-
04
Preconstruction and loading plan
We meet your superintendent or facilities director on the roof, agree the hours, access and sequence, and issue the materials loading and crane safety plan and the written crew briefing in Spanish and English.
You receive: A site-specific safety plan, a drawn staging and sequencing plan and a named foreman.
-
05
Installation with a daily report
Our own crews install under working foremen with bilingual supervision. Every shift ends watertight. Every day you receive a report with the men on the roof, the hours, the quantities installed by area, any delays and the photographs.
You receive: A same-day report you can forward to the owner, with photographs of every detail before cover.
-
06
Inspection, warranty and closeout
The manufacturer's technical representative inspects at completion and the warranty is issued on their sign-off. We walk the roof with you, close the punch list and hand over the closeout package.
You receive: The manufacturer's warranty, the as-built roof plan, the maintenance guidance and a service contact.
Why the language matters
Supervised in Spanish, reported in English
Our field workforce speaks Spanish and our customers speak English. We treat that as an operating condition, not an excuse. Every crew receives a written scope briefing in Spanish before the job starts: the system and attachment by zone, the site contacts, the access, the hours, the safety plan and the daily target. Field supervision is bilingual. The daily report comes to you in English, the same day, with photographs.
The result is a crew that understands the job on day one and a customer who gets a clear record every evening.
What a daily report contains
- Men on the roof and hours worked
- Quantities installed by area: field, walls, details and sheet metal
- Weather, delays and anything that needs a decision from you
- Photographs of every detail before it is covered
- Safety briefing and inspection record for the day
Questions owners ask
Straight answers
Can my roof be recovered, or does it have to come off?
Code allows one recover over an existing roof if it is dry, attached and the structure can take the weight; a second roof must come off. We take core cuts and a moisture survey before we answer, because a recover over wet insulation fails and voids the warranty. The proposal tells you which it is and why.
How much insulation does the energy code require?
In Maryland, Virginia, Washington and Pennsylvania the current codes call for far more insulation than most roofs built before 2010 carry. We read the code edition the jurisdiction has adopted and size the polyiso to it, normally in two staggered layers, and we tell you if the added height affects your parapets, doors and curbs.
What does a manufacturer warranty actually cover?
A no dollar limit system warranty covers the membrane, the flashings and the labor to repair a leak for the term, twenty or thirty years, with no cap. A material-only warranty covers the sheet and nothing else. We are certified to register the system warranties, the manufacturer inspects the roof before issuing one and we tell you in the proposal which warranty you are buying.
Can you work while the building is occupied?
Most of our work is on occupied buildings: offices, plants, schools, apartment towers and live data centers. We choose the attachment method for the occupancy below, agree the hours and the sequence with you in writing, and every shift ends with the roof watertight.
Do you work in winter?
Yes, within the manufacturers' temperature limits. Adhered work in the cold months is done with winter-grade adhesives, delivered and stored heated, and welded systems are tested each morning. We state the winter terms in the proposal so the schedule has no surprises.
Who is on my roof and who do I call?
Our own employees, led by a working foreman you will meet at the preconstruction meeting. Field supervision is bilingual, the daily report comes in English and a principal of the company is reachable by phone on every job.
Do you travel?
Yes. Our home territory is Maryland, Washington, Virginia and Pennsylvania, and our crews travel for data center campuses and multi-site programs nationwide. We have run winter work in Connecticut and data center and plant work in Ohio and Indiana.